Planned maintenance should be undertaken every 3,850 hours or 12 months, whichever comes first. This will reduce unplanned downtime and help to ensure your robot keeps running. We understand that downtime is lost production ! As part of our Maintenance program, our engineers will check the following items where applicable: - Take a controller memory back up.
- Visual inspection of general robot condition, robot internal harness and robot connection cables.
- Brake operation and overtravel switch operation.
- Repeatability test.
- Check for excessive audible vibration and noise.
- Lubricate as per specification.
- Visual inspection of controller condition and Teach pendant cable
- Check cable connections, cooling fans, power supplies and transformer tappings, emergency stop operation, interlock operation, hand broken operation and teach pendant operation.
- Test and replace RAM and APC batteries, as required.
- Provide report on condition of robot and controller detailing any further action required.
|